{"id":11292,"date":"2024-04-05T06:41:44","date_gmt":"2024-04-05T06:41:44","guid":{"rendered":"https:\/\/metropolitni.brno.cz\/projekty\/metropolitni-rozvojove-lokality\/"},"modified":"2024-04-08T12:39:45","modified_gmt":"2024-04-08T12:39:45","slug":"metropolitni-rozvojove-lokality","status":"publish","type":"projekty","link":"https:\/\/metropolitni.brno.cz\/en\/projects\/metropolitni-rozvojove-lokality\/","title":{"rendered":"Metropolitan Development Locations"},"content":{"rendered":"\n<p class=\"has-text-align-justify\">There are a number of sites in the BMO that currently have no use, but some of these could be significantly transformed in a few years. Their development is ensured primarily by a comprehensive approach to the solution of the given areas.<\/p>\n\n\n\n<p class=\"has-text-align-justify\">A vacant and undeveloped or built-up but unused location in a large city or its hinterland is often considered an ideal place for development, not only for housing but also for business activities. In reality, however, its <strong>suitability depends on many other factors.<\/strong> It is important to provide <strong>adequate transport links and a good range of public services so that<\/strong> people can get to work and school quickly and easily, or travel for culture or sport, and have <strong>good access to basic services such as retail, education, and leisure.<\/strong> Only those development sites that have these factors in place will contribute to the continued balanced growth of the whole metropolitan area.<\/p>\n\n\n\n<p class=\"has-text-align-justify\">If development is not addressed comprehensively, the well-known negative consequences of suburbanization will soon follow. With the ITI, we are able to both mitigate these consequences retrospectively and<strong> support future projects to ensure that the development site does not lack anything at the outset.<\/strong> For example, we finance the construction of cycle paths, interchanges, public spaces, schools, and parking facilities, and this set of projects will be implemented within the locality. With this approach, <strong>everything that the locality needs is built in a relatively short time.<\/strong> At the same time, we are gradually fulfilling the vision of our strategy, which aims to support the development not only of Brno but also of other secondary centres in BMO.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong><strong>Modern living with views of the castle<\/strong><\/strong><\/h2>\n\n\n\n<p class=\"has-text-align-justify\">The area <strong>near the train station in Bu\u010dovice<\/strong>, for example, will be transformed in such a comprehensive way. The local Um\u011bleckopr\u016fmyslov\u00fd z\u00e1vody used to produce furniture, but then the company became an unused and dilapidated brownfield. <strong>The demolished factory buildings will be replaced by modern housing and quality public spaces with greenery.<\/strong> The new family and apartment buildings will be complemented by multi-purpose sports facilities, a children&#8217;s&nbsp;playground, and a park. There will also be elements of blue-green infrastructure with the environment in mind, including the revitalization of the Litava River, around which a cycle path will run. Residents of the locality will appreciate the proximity of the railway station with a direct connection to Brno and the view of the adjacent castle. The general public will make use of the P+R parking for cars and B+R (bike and ride) for bicycles.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"817\" src=\"https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/UP-zavody-vizualizace-1024x817.jpg\" alt=\"\" class=\"wp-image-10929\" style=\"width:700px\" srcset=\"https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/UP-zavody-vizualizace-1024x817.jpg 1024w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/UP-zavody-vizualizace-300x239.jpg 300w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/UP-zavody-vizualizace-768x613.jpg 768w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/UP-zavody-vizualizace-1536x1226.jpg 1536w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/UP-zavody-vizualizace-2048x1635.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Visualisation: The UP plants Bu\u010dovice<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong><strong>New apartments, homes, schools and parks<\/strong><\/strong><\/h2>\n\n\n\n<p class=\"has-text-align-justify\">A completely new district is being built north of Brno in Ku\u0159im, which will increase the <strong>town&#8217;s&nbsp;population by a third<\/strong> once it is completed. <strong>One thousand flats and nearly three hundred family houses<\/strong> will be built in the Z\u00e1ho\u0159\u00ed locality<strong>.<\/strong> The entire construction will connect Ku\u0159im with the local district of Podles\u00ed, which is still separated from the town by fields and a busy road towards Svitavy. However, the new district will not only offer housing. It will also include a kindergarten, a primary school, and a secondary school. Sufficient parking capacity, recreational zones, parks, blue-green infrastructure, and the use of smart technologies are, of course. Both the private and public sectors are simultaneously involved in the construction of the district.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/Kurim-Zahori-vizualizace-1024x1024.jpg\" alt=\"\" class=\"wp-image-10931\" style=\"width:auto;height:600px\" srcset=\"https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/Kurim-Zahori-vizualizace-1024x1024.jpg 1024w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/Kurim-Zahori-vizualizace-300x300.jpg 300w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/Kurim-Zahori-vizualizace-150x150.jpg 150w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/Kurim-Zahori-vizualizace-768x768.jpg 768w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/Kurim-Zahori-vizualizace-1536x1536.jpg 1536w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/Kurim-Zahori-vizualizace-2048x2048.jpg 2048w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/Kurim-Zahori-vizualizace-500x500.jpg 500w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/Kurim-Zahori-vizualizace-860x860.jpg 860w, https:\/\/metropolitni.brno.cz\/wp-content\/uploads\/2024\/04\/Kurim-Zahori-vizualizace-520x520.jpg 520w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Visualisation: Ku\u0159im Z\u00e1ho\u0159\u00ed<\/figcaption><\/figure>\n\n\n\n<p>In Brno, we focus, for example, on the following development sites:<\/p>\n\n\n            <div class=\"w-full py-5 items-center flex\">\n                \n<div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>Smart district \u0160pit\u00e1lka <\/strong>&#8211; the area of former heating plants will become Brno&#8217;s&nbsp;first smart district.<\/p>\n\n\n\n<p><strong>Nov\u00e1 Zbrojovka<\/strong> &#8211; a new district for 20,000 people is being built in the former industrial area.<\/p>\n\n\n\n<p><strong>New Trnit\u00e1 district<\/strong> &#8211; the heart of the area will be a wide boulevard from the new railway station to the city centre.<\/p>\n\n\n\n<p><strong>Brno Technology Park<\/strong> &#8211; the site will be expanded to include housing, offices, parking and sports facilities.<\/p>\n\n\n\n<p><strong>P\u0159\u00edz\u0159enice development site<\/strong> &#8211; the new district will be connected to the city by a tram or trolleybus line.<\/p>\n<\/div>\n            <\/div>\n            ","protected":false},"excerpt":{"rendered":"<p>There are a number of sites in the BMO that currently have no use, but some of these could be significantly transformed in a few years. Their development is ensured primarily by a comprehensive approach to the solution of the given areas. A vacant and undeveloped or built-up but unused location in a large city<\/p>\n","protected":false},"featured_media":10932,"template":"","projekty-kategorie":[147],"archiv":[],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/metropolitni.brno.cz\/en\/wp-json\/wp\/v2\/projekty\/11292"}],"collection":[{"href":"https:\/\/metropolitni.brno.cz\/en\/wp-json\/wp\/v2\/projekty"}],"about":[{"href":"https:\/\/metropolitni.brno.cz\/en\/wp-json\/wp\/v2\/types\/projekty"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/metropolitni.brno.cz\/en\/wp-json\/wp\/v2\/media\/10932"}],"wp:attachment":[{"href":"https:\/\/metropolitni.brno.cz\/en\/wp-json\/wp\/v2\/media?parent=11292"}],"wp:term":[{"taxonomy":"projekty-kategorie","embeddable":true,"href":"https:\/\/metropolitni.brno.cz\/en\/wp-json\/wp\/v2\/projekty-kategorie?post=11292"},{"taxonomy":"archiv","embeddable":true,"href":"https:\/\/metropolitni.brno.cz\/en\/wp-json\/wp\/v2\/archiv?post=11292"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}